Our Previous Works

H.E.M.E. in Emerald, QLD has been providing quality engineering solutions for various industries since 1997. From design, fabrication, machining to low-cost manufacturing, we have assisted in agriculture, civil and mining projects in Bowen Basin. If you’re interested to see our works, view our successful projects here:

78m Rejects
Conveyor Replacement

Project was to modify original design, fabricate, sandblast, paint and ... assemble four sections (3 x 18m and 1 x 24m) of gantry with additional guarding, alignment of head drive pulley and access platform.

1800 Coffin Seal Outbye Blast Door Seal Arrangement

This project was to modify original design, certify, fabricate, sandblast, ... paint and deliver to site within 7 working days.

H.E.M.E. has a strong local supply chain that assisted us to be successful and achieve this desired outcome of design and RPEQ Certification.

Project was completed: 1. On-time 2. On-budget 3. Injury free
The customers feedback from Lex Watson, Conveyor Install Coordinator said, “It assisted us in minimal down-time and the coffin seal arrangement delivered the outcomes we anticipated”.

Cable and Cotton Reels

We have designed, modified and fabricated, sandblasted and painted ... many different configurations of reels over the years.

D11R Bulldozer Overhaul

This project was to repair pivot and equaliser bar, replace chrome sleeves ... and cannons, replace door seals, repair air-conditioning, fabricate additional handrail and fire suppression bracket, overhauled track adjuster, sandblast and paint track frames.

Project was completed: 1. On-time 2. On-budget 3. Injury free

Hitachi Boom Repair

Hitachi boom had cracked and was repaired on site which failed. ... The section was removed, fabricated new sections, heat stressed, sandblasted and painted.

Main Vent Fan – Duct & Knife Gate

Project was to replace the main vent fan duct and knife gate which included ... design, fabrication, sandblast, paint and assemble all assemblies, deliver to site and fabricate additional guarding.

Project was completed: 1. On-time 2. On-budget 3. Injury free

Marion 8200 Swing Cassette Cartridge Assembly

This project was to machine on mill and lathes new modified swing cassette ... cartridge from raw material from the mill.

Project was completed: 1. On-time 2. On-budget 3. Injury free

CONVEYOR PULLEY NEW AND OVERHAUL

We have overhauled manufactured new many different configurations ... of pulleys, drive/non-drive, some of which required stripping, replacing shaft, replacing barrel, fitting new bearings - ring locks and speed sensors, hot and cold lagging, sandblasting, painting, assembly and delivery to site.

Project was completed: 1. On-time 2. On-budget 3. Injury free 4. QA Documents

RH340 BUCKET REFURBISHMENT

Project was to collect from site, replace floor, wear liner packaging, line bore ... and bush hitch points, gauge and repair noseing, NDT test and return back to site.

Project was completed: 1. On-time 2. On-budget 3. Injury free

SISTER SHEAVE OVERHAUL

Project was to strip, replace shaft with new, replace spacers, fabricate and ... repair frame, sandblast, paint, assemble and delivered to site.

Project was completed: 1. On-time 2. On-budget 3. Injury free